Concrete Calculator

Estimate how much concrete to order for a slab, footing, post hole or set of steps, and how many premixed bags that would take.

What are you pouring?
ft
ft
in
%
5–10% typical
$/yd³

Result

Concrete needed1.96 yd³52.8 ft³ · 1.5 m³
40 lb bags176
60 lb bags118
80 lb bags88
Approx. weight7,920 lb3.96 tons

How the concrete calculator works

Concrete is ordered by volume. The calculator works out the volume of each element in cubic feet, adds your waste allowance and divides by 27 to give cubic yards, the unit ready-mix plants sell. It also divides the cubic feet by the yield of standard premixed bags so you can compare a truck delivery with mixing it yourself.

Formulas

  • Slab, footing or wall: length × width × thickness (ft)
  • Round column or post hole: π × (diameter ÷ 2)² × height
  • Stairs: each step is treated as a solid block from the ground to its tread, which is how most contractors do a quick takeoff

Bag yields used: 40 lb ≈ 0.30 ft³, 60 lb ≈ 0.45 ft³, 80 lb ≈ 0.60 ft³. Check the bag label, because yields vary slightly between products.

Worked example: a 12 × 12 patio

A 12 ft square patio poured 4 inches thick is 12 × 12 × 0.333 = 48 cubic feet. That is 1.78 cubic yards, or 1.96 yards with 10% extra. In bags it would be 88 × 80 lb bags, close to 3½ tons of material to lift and mix, so a 2-yard ready-mix order is the practical choice.

Common slab thicknesses

ProjectTypical thickness
Walkway, patio, shed floor4 in
Garage floor (cars)4–5 in
Driveway4–6 in
Hot tub or heavy equipment pad6 in or more

These are common practice, not engineering advice. Local building codes, soil conditions and loads decide the final design, so check with your building department for anything structural.

Before you pour

  • Compact a gravel base under slabs; the gravel calculator sizes it in tons.
  • Measure the formed area, not the plan, and use the square footage calculator for irregular shapes.
  • Schedule the truck for a dry, mild day and have enough helpers: concrete starts to stiffen in about an hour and a half.

Frequently asked questions

How many 80 lb bags of concrete make a yard?

About 45. An 80 lb bag yields roughly 0.6 cubic feet, and a cubic yard is 27 cubic feet, so 27 ÷ 0.6 = 45 bags. You would need 60 bags of the 60 lb size or 90 of the 40 lb size.

How thick should a concrete slab be?

Four inches is standard for patios, walkways and garage floors for cars. Driveways that carry heavier vehicles are usually 5–6 inches.

When is ready-mix cheaper than bags?

Beyond about one cubic yard, a ready-mix truck is usually cheaper and much faster. Many suppliers charge a short-load fee for orders under a few yards, so compare both.

How much extra concrete should I order?

Add 5–10%. Forms bulge, subgrades are uneven and some concrete stays in the truck or wheelbarrow.

How much does a yard of concrete weigh?

Roughly 4,000 lb (about 2 tons) for normal-weight concrete, based on about 150 lb per cubic foot.

Sources and official references

Last reviewed October 10, 2026. Results are estimates for planning; see our disclaimer.

Concrete guides

Construction workers pouring concrete from a wheelbarrowHow Many Bags of Concrete Do I Need? 40, 60 and 80 lb Bag ChartsFind how many 40, 60 or 80 lb bags of concrete you need for slabs, posts and footings, with yield charts, worked examples and when to switch to ready-mix.3 min readA man standing on a freshly poured concrete slabHow Thick Should a Concrete Slab Be? Patios, Driveways, Garages and ShedsTypical concrete slab thicknesses for patios, walkways, garage floors, driveways and equipment pads, plus base, reinforcement and control-joint basics.3 min readA cement truck parked on a gravel lot with toolsHow to Order Ready-Mix Concrete: Yards, Slump, Strength and DeliveryWhat to tell the batch plant when ordering ready-mix concrete: volume, strength, slump, additives and site access, plus how to avoid running short.4 min readA group of construction workers on a building siteConcrete for Footings and Post Holes: Sizes, Depth and VolumeCalculate concrete for deck footings, fence posts and continuous footings. Covers frost depth, form tubes, hole sizes and how to total many holes at once.4 min readConstruction workers working on a concrete siteConcrete Curing Time: When Can You Walk, Drive and Build on It?A practical timeline for new concrete: when to walk on it, when to drive on it, why 28 days matters, and how to cure it properly in hot and cold weather.3 min readA group of construction workers working on a buildingConcrete Mix Ratios Explained: 1:2:3, 1:2:4 and Water–Cement RatioUnderstand concrete mix ratios, how much cement, sand and gravel go into a cubic yard, why the water–cement ratio controls strength, and how to mix by hand.3 min read